Client & Building Professionals Login
Clients and building professionals can sign in below to access their Sumer Innovations project dashboard, professional portal, and AEC platform tools.
Amed K.
Fair Lawn, NJ
- Availability today - Typical active hours from 08:00 AM to 08:00 PM
Project Manager
YLB Draft and Design, Fair Lawn, NJ | 2025 – Present
-
Manage residential and commercial projects across the United States, coordinating with licensed architects, contractors, and clients.
-
Develop detailed construction drawings for single-family, multi-family, and commercial projects, ensuring accuracy and code compliance.
-
Oversee interior design development for residential projects, selecting finishes and layouts aligned with client vision.
-
Produce high-quality exterior renderings and visualization packages to clearly communicate design intent for client and stakeholder approval.
Architectural Designer
Studio 5 Partnership Architects, Fair Lawn, NJ | 2022 – 2025
-
Lead design and technical documentation for government, commercial, educational, and residential projects.
-
Develop BIM models for retail storefronts and residential units, including cladding, glazing, and mullion systems.
-
Prepare comprehensive construction drawings for façade redesign projects, including Niky Store, coordinating consultant input for approvals.
-
Produce photorealistic renderings and visual presentations to support client and stakeholder engagement.
Architectural Designer
Raunik Design Group, Gold Coast, Australia | 2021
-
Delivered design and permitting documentation for multi-site childcare facilities.
-
Created collaborative ArchiCAD models and ensured compliance with Early Childhood Regulatory Authority requirements.
BIM Specialist
AGS Commercial Pty Ltd, Lismore, Australia | 2020 – 2021
-
Built detailed Revit models for commercial and industrial facilities.
-
Conducted early-stage clash detection and produced coordinated design drawings.
Facade designer
ABS Facades, ACT, Australia | 2018 – 2021 -
Built detailed CAD models for commercial and industrial facilities.
-
Conducted early-stage clash detection and produced coordinated design drawings.
Project Architect
GCE, Qatar | 2014 – 2015
-
Produced and coordinated architectural drawings for Salwa Resort, a major hospitality and leisure development.
-
Acted as liaison between design and engineering teams to maintain alignment between design intent and construction execution.
Senior Architect
CCC – Consolidated Contractors Company, Qatar | 2010 – 2014
-
Directed design documentation for infrastructure and sports projects, including Lusail Stadium (FIFA World Cup 2022).
-
Reviewed subcontractor shop drawings, issued RFIs, and coordinated updates in the BIM environment.
Project Architect
Hochtief Construction Qatar W.L.L., Qatar | 2009 – 2010
-
Contributed to design and technical detailing for Barwa Commercial Avenue, a 56,600 m² mixed-use development.
Project Architect (Residential Focus)
Al-Aqsa Engineering Consultancy, Qatar | 2005 – 2009
-
Managed the full project lifecycle for multiple high-end residential villas from concept design through construction.
-
Conducted client meetings, secured municipal approvals, and supervised site execution.
-
Notable project: House in The Pearl (11,840 SF) — led design proposals, coordinated approvals with UDC, and oversaw construction.
multifamily house
Multifamily house Designed using CAD rendered using Vray
Interior design
Interior views of a resedential house showing the living area, Cad , Sketch up and Vray
Sing family house
a house showcases a charming design featuring multiple dormers that punctuate the inclined roof
indoor house garden in a humid warm area
singlw family house that is desprate for a rich landscape design despite warm humid wheather
Going through getting NCARB certificate (ongoing)
881920
New Jersey
YLB draft & design
Master degree in architecture design
UTAS
2017
No reviews yet.
| Week Day | From | To | Time Zone |
|---|---|---|---|
| Monday | 08:00 AM | 08:00 PM | |
| Tuesday | 08:00 AM | 08:00 PM | |
| Wednesday | 08:00 AM | 08:00 PM | |
| Thursday | 08:00 AM | 08:00 PM | |
| Friday | 08:00 AM | 08:00 PM | |
| Saturday | 08:00 AM | 08:00 PM | |
| Sunday | Not Available |
80% (32 to 36 hrs/week)